New Heating System for Sanctuary and Church Hall

The church heating system is being switched over from the boiler to a forced-air system.  All of the radiators have been removed and ductwork is being installed.  Heating will come from two external units; a rooftop unit over the Choir Room, and one on the Suffolk Street (north) lawn.  Installation should be completed in October; during installation, electricity to the building will be interrupted periodically, and will be off completely October 1 and 2.